ISSN: 2578-4846
Authors: Ovchinnikov VP*, Rozhkova OV, Ovchinnikov PV, Shemelina ON and Paveleva YN
The development of technologies and technical means of well structures intended for the production of high-viscosity oils is an urgent problem in the oil and gas industry. The design of well structures is determined by geological factors. The well design should ensure trouble-free construction of a sealed space of a stable channel between the fluid-saturated layers and the earth's surface.
Keywords: Bottom Hole Assembly; Measurement While Drilling; Non-Productive Time; Annular Blowout Preventer