Petroleum & Petrochemical Engineering Journal Research Article 4 min read

Performing a Risk Analysis Study for Implementing a Biodiesel Plant

Elgharbawy AS*
* Corresponding author
ISSN: 2578-4846  10.23880/ppej-16000248  Received: January 13, 2021  Published: January 28, 2021
  views
 10 references
 3 tables
PDF
Keywords
Risk Risk analysis Biodiesel
Abstract

Risk as, an uncertain event, or condition that if it occurs, has a positive or negative effect on a project's objective. Risk analysis is done via interviews and brainstorming considering the available and extensive experience of the involved stakeholders. Each identified risk is prioritized through a qualitative risk analysis process considering the probability of occurrence and the impact by project stakeholders. The results of risk management planning processes are used to update/re-plan the project management plan to consider the risk effect on the project. The biodiesel project is very profitable, the economic indicators for the project are very high, and the execution of such a project will strengthen the national economy. Therefore, a biodiesel risk analysis is performed to achieve security for the plant. The depletion of fossil fuel forces the world to look for alternative ways for energy production. The most common way is the production of biodiesel from waste cooking oil. This paper presents a detailed cost analysis for a biodiesel plant with capacity 100,000 ton/year.

Introduction

Business risk is the factors that a company or organization will face and will lower its profits or lead it to fail. Anything that threatens a company’s ability to achieve its financial goals is considered a business risk [1]. In some cases, the cause of risk is external to a company. Because of this, it is impossible for a company to completely protect itself from risk. However, there are ways to mitigate the overall risks associated with operating a business; most companies accomplish this through adopting a risk management strategy [2, 3].

Business risks arise from uncertainty about the profit of a commercial business due to unwanted events such as changes in tastes, changing preferences of consumers, strikes, increased competition, changes in government policy, obsolescence etc.. Business risks are controlled using techniques of  risk management. In many cases, they may be managed by intuitive steps to prevent or mitigate risks, by following regulations or standards of good practice, or by  insurance.  Enterprise risk management  includes the methods and processes used by organizations to manage risks and seize opportunities related to the achievement of their objectives [4, 5]. Economically, biodiesel is more profitable than petro-diesel as biodiesel plants does not cost more money like refining plants, in addition low cost of biodiesel feedstock rather than expensive crude oil the feedstock of petro-diesel [6]. Production of biodiesel is a simple process that does need neither a license nor a complicated technology [7]. Environmentally, biodiesel is better as it does not contain sulfur so sulfur emissions is eliminated [8]. It is renewable as biodiesel is produced from renewable resources such as used cooking oil or biological organisms while petro-diesel made from finite sources [9, 10].

Definitions

  • Risk Assessment: a systematic investigation and analysis of potential risks, combined with the assignment of severities of probabilities and consequences. These are used to rate risks in order to prioritize the mitigation of high risks.
  • Risk: A negative effect of uncertainty.
  • Opportunity: A positive effective of uncertainty
  • Risk Mitigation: a plan developed with the intent of addressing all known or possible risks and preventing their occurrence.
  • Interested parties: Institutions and individuals who may influence or be influenced by operations of the organization.

Risk Analysis for Biodiesel Plant

Table 1 shows the risk analysis applied to predict the risk of biodiesel plant. Table 2 explains the risk characteristics. Table 3 describes the probability of event. Table 4 describes the impact of risk.

CategoryRiskProb.ImpactRisk
Value
Accept
risk
Operation and MaintenanceLarge scale oil/ Fluid spill incident in populated area3412Y
Operation and MaintenanceSmall-medium scale oil spill incident in populated area5210Y
HSEHigh LEL4416N
Operation and MaintenanceInternal corrosion339N
ConstructionConstruction accident248Y
ConstructionNew construction activities affecting existing pipeline428N
Force MajeureMajor earthquake248N
Operation and MaintenanceIncreased tanker traffic428N
DesignLand use and acquisition risk236N
FinancialInterest rate risk326N
Labor risksOperational accident236N
Operation and MaintenanceExternal corrosion326N
Operation and MaintenanceLarge scale oil spill incident in unpopulated area326N
FinancialDefaulting on debt (bonds)155N
Operation and MaintenanceSmall-medium scale oil spill incident in unpopulated area515N
ConstructionInferior quality materials or equipment144N
ConstructionGround composition/unstable ground144N
ConstructionErosion - Mudslide - Landslides144N
ConstructionFire in construction site144N

Table 1: Project Risk Register. • Y: the risk is accepted • N: the risk is not accepted.

CategoryNameCharacteristics
5CatastrophicDisastrous impact on success of the project. Debilitating financial and temporal impact. Certain
injuries or fatalities
4CriticalConsiderable impact on success of the project. Major financial and temporal impact. Probable
injuries or fatalities.
3SignificantNoticeable impact on success of the project. Significant financial and temporal impact. Possible
injuries or fatalities.
2MinorMinimal impact on success of the project. Some financial and temporal impact. No injuries or
fatalities.
1NegligibleNo impact on success of the project. No damage to the system. No injuries or fatalities.
Negligible financial impact.
5Very highAlmost certain to occur
4HighCan be expected to occur in the life of the project
3MediumAs likely to occur as not occur
2LowMay occur occasionally
1Very lowUnlikely to occur, but possible

Table 2: risk characteristics

Probability12345
5 - Very high
4- High
3 - Medium
2 - Low
1 - Very low

Table 3: Risk Impact.

Conclusion

Explored the range of risks that organizations may be exposed. We have not only introduced ourselves to the main financial risks but also to the other risks which may indirectly impact on the finances of organizations – such as operational, reputational and legal and regulatory risk. Examined how the process of risk management should be implemented within organizations – thereby providing the structure for examining each type of financial risk in detail. It is important that the individual risks be not looked at entirely in isolation from each other. Doing so is what is known as a silo approach to risk management. Instead, managers must develop a holistic view of risk. Organizations may have small exposures to the individual risks, but when these are aggregated, they may have, in total, substantial financial and non-financial risks that require careful management. What we do certainly know – given the recent catalogue of high- profile financial calamities-is that the failure to manage risks can have devastating and, on occasion, terminal outcomes for organizations.

References

  1. Kaplan RS, Norton DP (1996) The Balanced Scorecard: Translating Strategy into Action. Harvard Business School Press, Boston MA, USA.
  2. Kaplan RS, Norton DP (2000) The Strategy-Focused Organization: How Balanced Scorecard Companies Thrive in the New Business Environment. Harvard Business School Press, Boston, USA.
  3. Kaplan RS, Norton DP (2008) The Execution Premium: Linking Strategy to Operations. Harvard Business School Press Boston MA, USA.
  4. Wheelen TL, Hunger JD (2012) Strategic management and business policy towards global sustainability. 13th (Edn.), Boston, Library of Congress Cataloging-in- Publication Data.
  5. Elgharbawy ASAA (2018) Review on Corrosion in Solar Panels. International Journal of Smart Grid-ijSmartGrid 2(4): 218-220.
  6. Elgharbawy A, Sayed A (2020) Production of biodiesel from used cooking using linear regression analysis. Journal of Petroleum and Mining Engineering 22(2): 92- 99.
  7. El-Gharbawy ASAA (2016) Production Of Biodiesel From Non Edible Vegetable Oil.
  8. Akubude V, Nwaigwe K, Dintwa E (2019) Production of biodiesel from microalgae via nanocatalyzed transesterification process: A review. Materials Science for Energy Technologies 2(2): 216-225.
  9. Elgharbawy AS, Sadik WA, Sadek OM, Kasaby MA (2021) Glycerolysis treatment to enhance biodiesel production from low-quality feedstocks. Fuel 284: 118970.
  10. Elgharbawy ASA (2017) Cost analysis for biodiesel production from waste cooking oil plant in Egypt. International Journal of Smart Grid-ijSmartGrid 1(1): 16-25.

Cite this article

BibTeX
APA
RIS
@article{elgharbawy2021,
  title   = {Performing a Risk Analysis Study for Implementing a Biodiesel Plant},
  author  = {Elgharbawy AS},
  journal = {Petroleum & Petrochemical Engineering Journal},
  year    = {2021},
  volume  = {5},
  number  = {1},
  doi     = {10.23880/ppej-16000248}
}
Elgharbawy AS (2021). Performing a Risk Analysis Study for Implementing a Biodiesel Plant. Petroleum & Petrochemical Engineering Journal, 5(1). https://doi.org/10.23880/ppej-16000248
TY  - JOUR
TI  - Performing a Risk Analysis Study for Implementing a Biodiesel Plant
AU  - Elgharbawy AS
JO  - Petroleum & Petrochemical Engineering Journal
PY  - 2021
VL  - 5
IS  - 1
DO  - 10.23880/ppej-16000248
ER  -